Preparation for construction work commencing or recommencing

AU | EN
Current site :    AU   |   EN
Australia
China
China Hong Kong SAR
Japan
Singapore
United States
Global

This article was written by Larissa Buriak and Arvin Nitchingham

In our last insight, we advised you of the Public Health (COVID-19 Temporary Movement and Gathering Restriction) Amendment (No 8) Order 2021 dated 17 July 2021 and the direction for work not to be carried out on a construction site in Greater Sydney (the Clause 24AB(1) Direction).  

The NSW Government issued a further order on 28 July 2021, the Public Health (COVID-19 Temporary Movement and Gathering Restrictions) Amendment (No 16) Order 2021 (Order).

Commencing at the beginning of 29 July 2021, the Order provides that despite the Clause 24AB(1) Direction certain works and activities required in preparation for construction work commencing or recommencing on a construction site in Greater Sydney including:

  • checking or maintaining installations or equipment
  • cleaning, waste removal or waste management
  • stocktaking or restocking
  • delivery of materials or equipment
  • servicing or installation of amenities
  • relocation on the construction site of plant or equipment
  • issuing permits or certificates
  • establishing arrangement or procedures to help protect persons from COVID-19
  • erecting fencing or hoarding
  • inspections, including for: technical reasons; or safety, including work health and safety; or for valuations or other financial reasons
  • removing water
  • connecting power, fuel or services
  • safety work, including work related to: fire safety; or electrical safety
  • surveying or marking out
  • training required to be carried out in the construction site,  

may be carried out unless the construction site is in the following local government areas:  

  • City of Blacktown;
  • City of Campbelltown;
  • Canterbury-Bankstown;
  • Cumberland;
  • City of Fairfield;
  • Georges River;
  • City of Liverpool; and
  • City of Parramatta,

(Restricted LGAs).

Are you ready to reopen?

We anticipate further public health orders will be published with additional guidance. It is understood that these further orders may address the following:

  • the resumption of construction in non-occupied settings outside of the Restricted LGAs subject to a square metre distancing rule;
  • implementation of COVID-19 Safety Plans by principal contractors; and
  • restrictions on construction in occupied residential premises, including a maximum construction worker on premises rule.

King & Wood Mallesons continues to advise extensively on impacts to the construction and maintenance sectors as a result of the COVID-19 pandemic.

We will continue to monitor the situation, however, please get in touch if you require any assistance with navigating these recent changes.

LATEST THINKING
Insight
Hong Kong is strategically positioned to influence the shift to sustainable finance and drive investment in green technology and infrastructure. One of the chief advantages Hong Kong holds is its potential to act as a super-connector between Mainland China and the global market. Plans made in late 2024 are set to further grow its green debt market and make it a ‘go-to’ for sustainable financing (find more on the Sustainable Finance Action Agenda below).

05 June 2025

Insight
The Australian Health Practitioner Regulation Agency (AHPRA) and National Boards have released advance copies of the Guidelines for registered health practitioners who perform non-surgical cosmetic procedures and Guidelines for practitioners who advertise higher risk non-surgical cosmetic procedures (the Guidelines).

03 June 2025

Insight
The NSW government has unveiled further details on its plan to improve the NSW workers compensation system’s handling of psychological injuries.

03 June 2025